Environment Evaluation for P.U.Z.
The Environmental Report for PUZ Industrial Area was drawn up in 2007 and is currently undergoing the permitting procedure.
PUZ and environment report - 2008 Archive
The final form of the draft plan and the environmental report.
Images:
The location within the territory
Territory Framing Plan The existing situation. Area survey. Utility
Urban planning - The Division of the area
Urban planning - The Division of the area - The end of the 7th year
Urban planning - The Division of the area - The end of the 14th year
Urban planning - The Division of the area - At the end of the activity
Urban planning - Town equipment
Urban planning - Roads, assurance measurement for the safety during the exploitation
Urban planning - Ownership over the lands
Urban planning - The circulation of the lands during the year 0
Ownership and circulation of the lands at the end of the 7th year
Ownership and circulation of the lands at the end of the 14th year
Ownership and circulation of the lands at the end of the 19th year
Ownership and circulation of the lands at the end of the 25th year
Forests. Tipes of ownership.
Plant images:
Urban details - The Plant's Area - The Division of the area
Urban details - The Plant's Area - Town equipment
Plant Framing
Announcement:
ENVIRONMENTAL REPORT for Amended Zoning Urbanism Plant for the Industrial Development Zone
Roşia Montană SEA public announcement - January 9, 2009 NEW
Plan of Public Participation process for the Strategic Environmental Assessment (SEA Report) issued for the plan of PUZ Amendment for Roşia Montană Industrial Zone - January 9, 2009 NEW
OVERVIEW OF THE PUBLIC PARTICIPATION PROCESS FOR THE STRATEGIC ENVIRONMENTAL ASSESSMENT OF THE RMP INDUSTRIAL AREA - January 9, 2009 NEW
Appendix 1
Meeting Minute 30.01.2007
Meeting Minute 22.03.2007
Meeting Minute 07.06.2007
Participants signature 30.01.07
Participants signature 22.03.07
Participants signature 07.06.07
Appendix 2
The location within the territory
Equipment
Urban regulations
Appendix 3
PGW- INCA report
Dispersion model annex Dec4th
Appendix 5A Alternattives selection
Appendix 5B Processing and Leaching Alternatives
Assessment of alternatives to Quaries
Appendix 6
Comparision PUZ 2002-PUZ 2006
Forest owner type
Location of railway
Location of wastewater treatment plant
Waste storage areas
Location of wels and springs. Groundwater flow direction.
Comparison RMP-PIA
Habitats
Project in relation to Natura 2000 areas site
Location of tailings disposial alternatives
1. Questions received in information centers
Volume 1
Volume 2
Volume 3
Volume 4
Volume 5
Volume 6
2. Contestation and questions received during public hearings
Volume 1
Volume 2
3. Questions received from Hungarian stakeholders
Appendix 1
Appendix 2
4. Questions received from Hungarian stakeholders - november 2009
5. Questions received from Hungarian stakeholders - december 2009