Environmental Impact Assessment for Roșia Montană Project

The Environmental Impact Assessment (EIA) Report for the Rosia Montana Project was developed by a team of independent experts. The report analyzes all the aspects of the gold and silver mining project from Rosia Montana, from the construction phase, going through the operational phase, mine closure and environmental rehabilitation, to the post-closure phase. This document is accessible for all interested stakeholders and was submitted for public debate, according to legal requirements.

1. Background

This chapter offers information about the project owner, the certified authors of the environmental impact assessment, an overall description of the project and its phases (pre-construction, construction, operation and closure), raw materials and chemical substances or preparations used in the project.

chapters


 
 

Explanatory Note


 
 
2. Technological Processes
3. Waste
4. Potential Impact

This chapter describes and analyzes the potential impact of the mining project on environmental factors, including its cross-border impact and proposed mitigation measures.

chapters


 
 

4.1 Potential Impact - Water

This section presents the potential impacts on surface and underground waters which could be generated if the Rosia Montana Project is implemented. This chapter also explains the safety measures that RMGC will take to maintain water quality in the project area.

Explanatory Note


 
 
4.2 Potential Impact - Air

This section presents details of the project phases and their potential impact on air quality. It also presents the measures to be taken by RMGC to minimize project impact on air quality.

Baseline Reports


 
 

Chapters


 
 

MANAGEMENT SYSTEM PLANS


 
 
4.3 Potential Impact - Noise and Vibrations

The following paragraphs present general information about the noise and vibrations generated by the Project activities, as well as the legal requirements, sources and potential categories of impact associated with the construction, operation and closure phases of the Rosia Montana Project.

Baseline Reports


 
 

chapters


 
 

MANAGEMENT SYSTEM PLANS


 
 

DOCUMENTS SUBMITTED IN PUBLIC CONSULTATION


 
 

Explanatory Note


 
 
4.4 Potential Impact - Soil

This section describes in detail the types of soil in the Project area and the measures aimed at preventing soil degradation, as well as the soil rehabilitation and reclamation activities that will take place throughout the operational phase.

Baseline Reports


 
 

chapters


 
 

Explanatory Note


 
 

Annexes


 
 
4.5 Potential Impact - Geology

This section describes the initial geological conditions for the Rosia Montana Projct, the regional and local geological characteristics and specificities of the Project site.

chapters


 
 

Explanatory Note


 
 
4.6 Potential Impact - Biodiversity

This chapter makes an inventory of the flora and fauna in the Rosia Montana area, and presents the measures that RMGC will adopt in order to protect biodiversity in the project impact area.

Baseline Reports


 
 

CHAPTERS


 
 

Management Plans


 
 

DOCUMENTS SUBMITTED IN PUBLIC CONSULTATION


 
 

Explanatory Note


 
 

Annexes


 
 
4.7 Potential Impact - Landscape

This section presents information about the current status of the landscape from Rosia Montana, the changes that the project will bring to the landscape and the reclamation and remodeling methods to be used in each product phase.

CHAPTERS


 
 

Explanatory Note


 
 
4.8 Potential Impact - Social and Economic Environment

This section offers an overview of the potential impacts, proposed improvement measures and related management plans concerning the economic and social aspects related to the Rosia Montana Project developed by RMGC.

Baseline Reports


 
 

CHAPTERS


 
 

MANAGEMENT SYSTEM PLANS


 
 

documents submitted in public consultation


 
 

Explanatory Note


 
 
4.9 Potential Impact - Culture and heritage

This section describes the potential impact of all Project phases on the cultural heritage, as well as the measures to be taken to protect historical assets in the mining project area.

Baseline Reports


 
 

chapters


 
 

DOCUMENTS SUBMITTED IN PUBLIC CONSULTATION


 
 
4.10 Potential Impact - Transport

The transport of equipment in the project area will take place in conditions of maximum safety, for which RMGC shall take all necessary measures.

chapters


 
 

Explanatory Note


 
 

Annexes


 
 
5. Review of alternatives
6. Monitoring
7. Risk assessment and management
8. Description of the difficulties
9. Non-Technical Summary
10. Cross-border impact
11. Additional documents